Location

Towcester Northamptonshire

Description

Top soil and sub soil striped and excavated independently and exported to field onsite to build up levels. This was further reinstated and seeded spring 2023 into a wildflower mix. Excavation was carefully done to retain neat and square holding edges.

A Geotextile membrane was installed before base 70mm crushed stone for added stability. The final finish is recycled road plainings to remain in keeping with existing track ways.