Location
Towcester, Northampton
Description
Description: Strip top soil and cut level proposed site ready for main construction. 6000 Cubic metres of spoil excavated and blended in new area on site. Bespoke fencing with large decking / Mounting area integrated to keep a simplicit yet complex feel. Prepare suitable base in specification to Martin Colins Enterprises requirements. 2.2 meter high wind break bund compacting in 200mm layers was installed around the ménage perimeter and battered down on the desired angle for client.