Location
Banbury, Oxfordshire
Description
Installation of reinforced concreted pad and manifold at a 1meter depth as required from drawings. From the Manifold, a total of 4 collector pipe loops where installed and depth of 1m for increased efficiency in heat take up from the ground. Our new Trenching wheel was used and made light work of the 500m of trenching required. Back filled in two stages with a 250mm wide pad foot roller has meant 100% of all trenched material went back in the ground and will avoid sinkage.
