
Trenching
With sustainability playing such a vast role in the construction sector, Clews & Co Construction has recently taken delivery of the UK’s first state of the art Trenching Rock Wheel, with the ability to cut a perfect uniform trench in any ground conditions.
The Rock Wheel comes into its own when laying power cables, fibre or ground source heating pipework, all in one pass. By having the ability to half back fill the trench as we go means that reduced material is produced, allowing for a neater and quicker back fill process.
First in the UK
Fastest method of trenching on the market
Cut lay and fill in one pass
Cut your costs!


As material is cut with the tungsten carbonate teeth, it gets finely ground down and in most cases suitable to bed any services. This saves huge expense of importing bedding material to site and exporting spoil off site. Subject to ground conditions, we can achieve up to 3-5m of trenching and cable laying per minute!
500mm – 1500mm depths available
75mm – 500mm widths available
Cut clean trenches or backfill as you go
Fastest method of trenching on the market

Key Benefits
More economical than a self-propelled chain trencher
A unit for the same output allowing greater access
Ability to cut all ground conditions (Clay, Stone & Soil…)
Cut material is turned into suitable bedding for services bedding
An all-in-one pass lay system is available for cable, piping and warning tape
Superior working speed vs an excavator saving time and money
Turn projects around quickly and efficiently
Major Uses In Industry
High voltage power cable distribution
Mains water distribution
Major fibre optic connections
Solar / Wind farm connections to the grid
Rail link communications
Ground source heating
CCTV and site communications
Large storm and foul drain installations
Gas mains distribution