Trenching

With sustainability playing such a vast role in the construction sector, Clews & Co Construction has recently taken delivery of the UK’s first state of the art Trenching Rock Wheel, with the ability to cut a perfect uniform trench in any ground conditions.

 The Rock Wheel comes into its own when laying power cables, fibre or ground source heating pipework, all in one pass. By having the ability to half back fill the trench as we go means that reduced material is produced, allowing for a neater and quicker back fill process.

First in the UK

Fastest method of trenching on the market

Cut lay and fill in one pass

Cut your costs!

Trenching
Trencher

As material is cut with the tungsten carbonate teeth, it gets finely ground down and in most cases suitable to bed any services. This saves huge expense of importing bedding material to site and exporting spoil off site.  Subject to ground conditions, we can achieve up to 3-5m of trenching and cable laying per minute!

500mm – 1500mm depths available

75mm – 500mm widths available

Cut clean trenches or backfill as you go

Fastest method of trenching on the market

Key Benefits

More economical than a self-propelled chain trencher

A unit for the same output allowing greater access

Ability to cut all ground conditions (Clay, Stone & Soil…)

Cut material is turned into suitable bedding for services bedding

An all-in-one pass lay system is available for cable, piping and warning tape

Superior working speed vs an excavator saving time and money

Turn projects around quickly and efficiently

Major Uses In Industry

High voltage power cable distribution

Mains water distribution

Major fibre optic connections

Solar / Wind farm connections to the grid

Rail link communications

Ground source heating

CCTV and site communications

Large storm and foul drain installations

Gas mains distribution